Writing in FutuREstorative back in 2016, I looked at what a construction project would look like in response to the Living Building Challenge‘s “what if every act of construction made the world a better place”

  • Projects would be net positive in all aspects, on place, nature, water, health, even knowledge and of course carbon.
  • Construction projects are carbon-positive: Strict carbon planning and management is key. Remaining carbon emissions after all carbon management improvements have been made are addressed with restorative offset programmes.

FutuREstorative drew on a Total Carbon Study from the Integral Group, DPR Construction and others that looked at the carbon profile through the life of a refurbishment project (DPR’s Construction San Francisco Office) and reported a number of key findings:

  • 􏰀For new buildings, it is critical to focus on reducing embodied emissions;
  • For existing buildings we need to focus on reducing operating emissions.
  • The largest reductions came from the use of high-mass and energy- intensive materials.
  • Carbon and Construction carbons are not understood.

Lloyd Alter writing in Treehugger established Upfront Carbon as a key concept term in addressing the ‘Climate Emergency’. ‘Embodied carbon is not a difficult concept at all, it is just a misleading term … I have concluded that it should be Upfront Carbon Emissions, or UCE”. (By the way, Lloyds article Let’s rename “Embodied Carbon” to “Upfront Carbon Emissions” is a must read that also illustrates how twitter conversations, with Elrond Burrell, can lead to improved industry thinking)

ARRO: a project carbon hierarchy

To achieve a positive carbon project, focusing on the essential upfront carbons,. FutuREstorative proposed a robust carbon hierarchy approach. As the waste hierarchy of ‘recycle, reuse, dispose‘ has become part of our construction waste lexicon so ARRO – Avoid, Replace, Reduce and Offset.should become part of the carbon lexicon

ARRO: From FutuREstorative,

Avoid: carbon through regenerative low carbon design, construction planning and sustainable facilities management …

Replace: high carbon techniques and activities with low carbon, regenerative solutions…

Reduce: seek to reduce carbon through local material and supplier procurement and a focus on construction travel and transport, carbon productivity and construction efficiency …

Offset emissions that cannot be managed out. But be aware you cannot offset the toxic greenhouse gas emissions eg NOX from use of diesel plant and transport.

It is worth noting that the RIBA 2030 Challenge calls for a reduction in embodied (upfront carbon) … rising incrementally from 50 in 2020 to 75% over the next decade before offsetting become acceptable

Asked recently at the end of a keynote zero carbon talk for three actions that we should be doing today, I responded with firstly to Take Back, secondly to Stop and thirdly to Think like a Tree. Admitedly, his was on the spot thinking, but based on a decade or so of engagement with sustainability thinkers, researchers, scientists, practitioners, it makes the basis for a good strategy

Take Back – On our watch , over the last 30 years , of urging sustainable construction, carbon in the atmosphere has increased from 320 to 415ppm. And we in the built environment are responsible for 40% of that increase. To get back to the science based safe target of 350 we need to be taking carbon out of the atmosphere. Therefore, the most responsible thing we can do is to design and construct buildings that are carbon sinks. Buildings that lock carbon away.

Stop – or at least severely reduce putting pollutants and carbon, into the atmosphere.

Think Like a Tree – carbon is an essential building block within nature. We need to rethink and understand carbon cycles, acknowledge that carbon is not the enemy. We need a better construction carbon and eco – literacy so we fully understand carbon as a natural currency cycle, evaluating carbon efficiency (carbon productivity) as we do financial efficiency.

Once we see carbon as a ‘currency’ then we can understand carbon productivity – how much value of building are we delivering for each unit of carbon emitted. This should become the KPI for projects, alongside or even replacing the measure of productivity in labour terms. It is one of the most simple of KPI’s., or could be, construction cost divided by upfront carbon. We tightly monitor and measure construction value, and we measure construction carbon, albeit unevenly.

In conclusion then …

An ABC for (Net) Zero Carbon Construction

Adopt a carbon strategy: of take back, of stopping emissions and of rethinking carbon as natural cycles,

Build robust carbon ARRO hierarchy strategies that Avoid, Reduce and Repair and Offset into every project

Carbon productivity monitored as a core KPI, with strong carbon leadership and literacy, that matches the level of focus we have on financial and safety performance within the industry


Next: Part 3 – Just What is Construction Carbon and Ecological Literacy


Image Source: Unsplash, EJ Yao

Grenfell Tower and the precautionary principle.

Many have written, blogged and commented on the avoidable tragedy at Grenfell Tower. I have been in two minds whether to add my voice, but then as a colleague pointed out, I have been blogging on themes pertinent to the tragedy since 2007. Theses themes (on risk, collaborative working, health sustainability, standards, strategies,  and construction improvement) have featured in this and other blogs, in numerous articles across many journals and of course brought together within the recently published FutuREstorative.

No doubt, in boardrooms across the world of built environment organisations, questions are being asked: have we designed, specified or installed similar materials and systems in similar situations. Do we really know? Do we know the materials, chemicals and the impacts of insulation we have installed? Where are the inspection and audit results, where are the material test certificates and evidence of compliance with specifications.

We do not know the exact cause and failures at Grenfell, but what has become clear is that this a systematic failure, a cocktail of failures and certainly not just a single cause.

faq_cce1

Back in my biz improvement / safety advisory role in the 90’s, we used the swiss cheese model for a systematic thinking approach to risk. In the swiss cheese model each slice of cheese is seen as a system activity or aspect layer, holes in individual layer may be problematic but other layers act as a defence to prevent more significant failure.

But when too many holes line up we see a catastrophic system collapse event.  As sadly we have seen at Grenfell Tower.

 

London fire: Screaming people trapped as blaze engulfs 27-storey Grenfell Tower in Notting Hill

Grenfell Tower will undoubtedly have a profound and highly significant impact on design, construction and building management worldwide, but we do not need to wait for an inquiry when we know the problems, the holes in the myriad of swiss cheese layers, and we know what needs to be fixed.

BUILT ENVIRONMENT HOLES IN THE SWISS CHEESE

deregulation and desire to have a legislation bonfire
slow response by government to head lessons learnt
lobbyist pressure to affect change
a fashion for ignoring experts
partial privatisation of the building inspection regime
fragmented supply chain
inappropriate materials or systems
lack of system thinking
a lowest cost mentality that still persists
passive fire strategies
material testing in isolation, not as a system
lack of transparency and impact knowledge of materials we specific, approve, install
ignorance of precautionary principle thinking
lack of collaborative working
failure to question – the “we can only do what the client, architect, contractor specifies’ culture
lack of understanding of building technology (cf uncompleted fire stopping)
inspections (see the Edinburgh Schools Report)
and so many more …

Grenfell should be seen as a warning for the deregulation many would like to see following Brexit. The great repeal bill is set to repeal many of the health and environment EU regulations (those that that ‘hamper uk business’ but will prevent other Grenfells).

Amongst the many causes, it has been suggested the fire may well have started from a faulty appliance. How sadly ironic that it was the perceived EU over-regulations on safe & efficient kettles and vacuums that became a cause-celeb in last years Brexit referendum. (Who are the EU to tell us how safe our kettles and vacuum cleaners should be ….?) See George Monbiot Too often safety has been sacrificed to an agenda of deregulation backed by lobbyists 

6442Moving in from the green fringe of the built environment sector, we have robust standards emerging containing material schedules built on the precautionary principle. (Here we can list the Living Building Challenge, WELL standards along with the Red List, Pharos, Declare and other lists.) Organisations and clients have their own schedules, for example Google’s Portico, British Lands Material Schedule. If such standards and red lists were adopted by the public sector, embedded into building regulations, then the cladding insulation at Grenfell would in all probability not have been permitted.

‘The precautionary principle implies that there is a social responsibility to protect the public from exposure to harm, when scientific investigation has found a plausible risk’

The precautionary principle states that if an action or policy has a suspected risk of causing harm to the public, or to the environment, in the absence of scientific consensus (that the action or policy is not harmful), the burden of proof that it is not harmful falls on those taking that action. The principle implies that there is a social responsibility to protect the public from exposure to harm, when scientific investigation has found a plausible risk. These protections can be relaxed only if further scientific findings emerge that provide sound evidence that no harm will result. (Wiki)

Lloyd Alter blogging in Treehugger illustrates the impact of the material used in Grenfell. What is sad is that this, to most, has come as a surprise.

What appears to have happened is that the Reynobond’s polyethylene core caught fire and the stack effect in the two-inch gap made it spread almost instantly. Apparently it got hot enough that the supposedly flame-retardant polyiso charred as well, putting out tons of smoke, possibly contributing cyanide and other toxic gases. The vinyl framed windows also melted, letting the toxic fumes into the suites very quickly.

As may be expected from media such as the Daily Mail, the green, carbon reduction, climate change agenda has emerged as a blame. Alice Bell writing in the Guardian(Don’t blame green targets for Grenfell) soundly kicks this into touch

But we do have a problem with many seeing building sustainability as simply being energy & thermal performance. The key message of FutuREstorative was to address the necessary shift in sustainability thinking, away from a blinkered focus on energy to one that embraces human and planetary health within a socially just and ecologically sound sustainability.  And … perhaps we should not use the word sustainability until we do.

Today, it is difficult to attend sustainability events where health and wellbeing is not a key theme and message, it is sad that this message is not percolating down through the long tail of construction where lowest cost is still prevalent. Lowest cost even at the high price of social and human life. (A mineral based insulation with a Fire Rating would have cost £2 m2 more than the polyurethane based, more flammable insulation used on Grenfell. It will be interesting to see any records of the value engineering exercise to arrive at this material choice, if indeed there was a recorded VE, and how the decision met the Social Value Act.

Update 30 June BBC Reporting evidence of VE (or cost engineering)

_96745579_document

Time then for all in the built environment sector, the government, lobbyist, clients, designers, contractors and building operators to adopt precautionary principle thinking, particularly when human health hazards have been flagged by coroners reports, data, research and lessons learnt .

This can be voluntarily done now, today.  To wait years for outcomes from an inquiry and the regulation changes that will surely follow, changes that will tell us what we already know, is simply irresponsible.

Not a good day for Green Building

Not a good day for Green Building in the USA.

Lloyd Alter on TreeHugger reports that the Green Building Initiative, which runs the Green Globes building certification system has been recognised as a LEED alternative by the federal General Services Administration

I feel sad for friends, colleagues, advocates in the US who are passionate in defending real green building and real building product transparency that will restore the damage done by the built environment.

Lloyd writes: The lobby organization formed last year to kill LEED and counting among its members just about every toxic chemical manufacturer in the USA, is ecstatic, but pushing for more …

The US Green Building Council that runs the LEED program put on a brave face in a press release, saying “At this point, it is unassailable, LEED works. It has played a significant role in GSA’s achievement of its energy and sustainability goals.”

Dream on. Green Globes is now recognized as legit and will eat your lunch; it’s cheaper, it lets builders use all that plastic, and doesn’t give points for FSC certified lumber. In state after state, the politicians paid for by the plastics industry will insist upon it.

Unfortunately I see this as a discussion, then argument and battle waiting to happen here in the UK and Europe. As we push for deeper green standards such as the Living Building Challenge, for deeper product transparency, as Google and other clients will undoubtedly push for non toxic red list materials in their buildings, we will see the push from the power of the petro-chemical, plastics  and big lumber organisations, resisting change for healthy products.

And unfortunately I see our UK Greenest Government Ever likely to side with these giants, removing as they already are in numerous areas, environmental protection so as not to damage industry and growth, headed by an Environmental Minister who is taking  green policy back to the 70s

The UK green build fraternity, advocates, green build councils and accreditation organisations needs to hold strong in the coming years.

cropped-pc210049flip.jpg

Inspired by Biomimicry

I participated in a short, sharp but highly inspirational #biomimicry tweetchat last night, hosted by TreeHugger with questions fielded by Janine Benyus

“Every design guideline that we need to plan the future already exists … in the bottomland hardwood forest and the tall grass prairie … Go outside. Quiet your cleverness. Listen to the lessons of the natives.”

Janine Benyus, Co-Founder, Biomimicry 3.8

download

TreeHugger have posted a useful record of the event, but there was so much (more) information, links and references shared during the chat I captured more of the tweetchat on a storify here:

Inspired by Biomimicry #biomimicry2013 Storify – Salient tweets links and comments from the whirlwind tweetchat hosted by Treehugger with Janine Benyus

Enjoy

newspaper house

Treehugger ( number 13 in the top 50 most powerful blogs according to the Observer on Sunday) carries the news of the London house built from discarded free newspapers that was revealed over the weekend – it took just 5 days to get the 150,000 papers!.  Read more here

Treehugger, which must be on everyones RSS feed, has a staggering 1.8million unique hits per month,  has 40 writers in 10 countries and was bought last year  by Discovery Channel for reportedly $10m.  It has pages dedicated to design and architecture that covers the eco and green aspects of the built environment.